[{"data":1,"prerenderedAt":432},["ShallowReactive",2],{"blog-post-\u002Fblog\u002Fgwp-building-materials-a1-a3":3,"blog-related-\u002Fblog\u002Fgwp-building-materials-a1-a3":418},{"id":4,"title":5,"author":6,"body":7,"description":343,"extension":344,"faq":345,"keywords":363,"meta":371,"navigation":372,"path":373,"primaryKeyword":364,"publishedAt":374,"rawbody":375,"readingMinutes":376,"seo":377,"sitemap":378,"sources":379,"stem":408,"summary":409,"takeaways":410,"updatedAt":374,"words":416,"__hash__":417},"blog\u002Fblog\u002Fgwp-building-materials-a1-a3.md","Global warming potential (GWP) of building materials: what A1–A3, C and D mean","Quarry",{"type":8,"value":9,"toc":332},"minimark",[10,15,19,22,45,48,52,55,204,207,211,214,217,220,224,227,230,233,237,240,243,250,254,257,290,293,297,300,320],[11,12,14],"h2",{"id":13},"what-is-global-warming-potential-gwp-in-an-epd","What is global warming potential (GWP) in an EPD?",[16,17,18],"p",{},"Global warming potential (GWP) expresses the climate effect of greenhouse gas emissions in kilograms of carbon dioxide equivalent (kg CO₂ eq). In an environmental product declaration (EPD) it is the amount of greenhouse gases emitted in a defined part of the life cycle of a product, per declared unit, for example per tonne of steel or per square metre of insulation.",[16,20,21],{},"The term has two uses, which is why searches for it mix building materials with refrigerants:",[23,24,25,33],"ul",{},[26,27,28,32],"li",{},[29,30,31],"strong",{},"For a gas, GWP is a factor."," It says how strongly one kilogram of the gas warms the climate compared with one kilogram of CO₂ over a set period. The factors in current use are calculated over 100 years, with CO₂ set at 1.",[26,34,35,38,39,44],{},[29,36,37],{},"For a product, GWP is a result."," Each greenhouse gas emitted is multiplied by its factor and the amounts are added. This is the figure printed in an EPD, and it is the basis of ",[40,41,43],"a",{"href":42},"\u002Fblog\u002Fembodied-carbon-explained","embodied carbon",".",[16,46,47],{},"EPDs that follow EN 15804+A2 report four climate indicators: GWP-fossil, GWP-biogenic, GWP-luluc (land use and land use change) and GWP-total, which is the sum of the other three. Older EPDs that follow EN 15804+A1 report a single GWP.",[11,49,51],{"id":50},"what-do-the-life-cycle-modules-a1a3-a4a5-b-c-and-d-mean","What do the life-cycle modules A1–A3, A4–A5, B, C and D mean?",[16,53,54],{},"Each module is a defined slice of the life cycle, and an EPD gives a separate GWP for every module it declares. The structure comes from EN 15804 for products and EN 15978 for buildings.",[56,57,58,74],"table",{},[59,60,61],"thead",{},[62,63,64,68,71],"tr",{},[65,66,67],"th",{},"Module",[65,69,70],{},"Stage",[65,72,73],{},"What it covers",[75,76,77,89,99,109,120,130,141,152,163,173,183,193],"tbody",{},[62,78,79,83,86],{},[80,81,82],"td",{},"A1",[80,84,85],{},"Product stage",[80,87,88],{},"Raw material supply",[62,90,91,94,96],{},[80,92,93],{},"A2",[80,95,85],{},[80,97,98],{},"Transport to the factory",[62,100,101,104,106],{},[80,102,103],{},"A3",[80,105,85],{},[80,107,108],{},"Manufacturing",[62,110,111,114,117],{},[80,112,113],{},"A4",[80,115,116],{},"Construction process stage",[80,118,119],{},"Transport to the site",[62,121,122,125,127],{},[80,123,124],{},"A5",[80,126,116],{},[80,128,129],{},"Construction and installation",[62,131,132,135,138],{},[80,133,134],{},"B1–B5",[80,136,137],{},"Use stage, building fabric",[80,139,140],{},"Use, maintenance, repair, replacement, refurbishment",[62,142,143,146,149],{},[80,144,145],{},"B6–B7",[80,147,148],{},"Use stage, operation",[80,150,151],{},"Operational energy use and operational water use",[62,153,154,157,160],{},[80,155,156],{},"C1",[80,158,159],{},"End-of-life stage",[80,161,162],{},"Deconstruction or demolition",[62,164,165,168,170],{},[80,166,167],{},"C2",[80,169,159],{},[80,171,172],{},"Transport to waste processing or disposal",[62,174,175,178,180],{},[80,176,177],{},"C3",[80,179,159],{},[80,181,182],{},"Waste processing for reuse, recycling or recovery",[62,184,185,188,190],{},[80,186,187],{},"C4",[80,189,159],{},[80,191,192],{},"Disposal",[62,194,195,198,201],{},[80,196,197],{},"D",[80,199,200],{},"Beyond the system boundary",[80,202,203],{},"Benefits and loads from reuse, recycling and energy recovery",[16,205,206],{},"A1, A2 and A3 are commonly reported as one figure, A1–A3.",[11,208,210],{"id":209},"what-does-gwp-a1a3-mean-and-how-do-cradle-to-gate-and-cradle-to-grave-differ","What does GWP A1–A3 mean, and how do cradle to gate and cradle to grave differ?",[16,212,213],{},"GWP A1–A3 is the greenhouse gas emission from raw material supply, transport and manufacturing, which is everything up to the factory gate. Cradle to gate means exactly this boundary. Cradle to grave covers the whole life cycle: modules A, B and C, with module D reported alongside.",[16,215,216],{},"A1–A3 is the figure quoted most often for a product, because it depends least on the project. From A4 onwards the results rest on scenarios: transport distance, installation, service life, the end-of-life route. The scenario in an EPD may not match your building. RICS's whole-life carbon standard therefore tells assessors to adjust scenario-based data to the project, or to replace it with generic data where it cannot be adjusted.",[16,218,219],{},"EPDs that follow EN 15804+A2 are, as a rule, required to declare modules C1–C4 and D in addition to A1–A3. A1–A3 alone tells you about production, not about the life of the product.",[11,221,223],{"id":222},"why-is-module-d-reported-separately","Why is module D reported separately?",[16,225,226],{},"Module D lies outside the life cycle of the product itself. It quantifies the net benefits or loads that arise when materials or energy leaving the system are reused, recycled or recovered in another product system, for example metal that is recycled or timber burned with energy recovery. A benefit appears as a negative value.",[16,228,229],{},"Because those effects occur beyond the system boundary and depend on a future scenario, they are shown apart from modules A to C. The EU framework for building-level reporting keeps the same separation. Under Delegated Regulation (EU) 2026\u002F52, the energy performance certificate shows results for the product stage (A1–A3), the construction process (A4–A5), use (B1–B4), operational energy (B6) and end of life (C1–C4), and puts module D in columns of its own. RICS likewise requires module D to be reported separately.",[16,231,232],{},"In practice: read D, report D, and do not subtract it from A to C unless the method you work to says so.",[11,234,236],{"id":235},"how-is-biogenic-carbon-shown","How is biogenic carbon shown?",[16,238,239],{},"Biogenic carbon is carbon derived from biomass, such as the carbon stored in timber. An EN 15804+A2 EPD shows it in two places: in the GWP-biogenic indicator for each module, and as a declaration of the biogenic carbon content of the product and its packaging, in kilograms of carbon.",[16,241,242],{},"The CO₂ absorbed by the growing tree is counted as a removal in A1–A3, so the A1–A3 figure of a timber product can be negative. At end of life the same carbon is counted as an emission, or as a transfer to the next product system, so it balances out over the life cycle. One kilogram of biogenic carbon corresponds to 44\u002F12, about 3.67, kilograms of CO₂.",[16,244,245,246,44],{},"This is the main reason why an A1–A3 value on its own can mislead for bio-based products. EPDs under EN 15804+A1 were not required to report biogenic carbon separately, and practice differed between programmes. For comparisons across materials, see ",[40,247,249],{"href":248},"\u002Fblog\u002Fsustainable-building-materials-epd-data","Sustainable building materials: how to compare them with EPD data",[11,251,253],{"id":252},"why-should-you-not-add-up-modules-blindly","Why should you not add up modules blindly?",[16,255,256],{},"Modules are designed to be added, but only within a method. EN 15804 expresses results in modules so that they can be aggregated for a building, and it leaves the rules for that aggregation to the building assessment, which means EN 15978 and national methods. A sum taken straight from the page goes wrong in five ways:",[258,259,260,266,272,278,284],"ol",{},[26,261,262,265],{},[29,263,264],{},"Modules that are not declared."," Not every EPD covers every module, and a module that is not declared is not zero.",[26,267,268,271],{},[29,269,270],{},"Scenarios that do not fit."," Modules A4, A5, B and C describe the manufacturer's scenario, not your site, your service life or your country's waste routes.",[26,273,274,277],{},[29,275,276],{},"Module D."," It sits beyond the system boundary and is reported next to the total, not inside it.",[26,279,280,283],{},[29,281,282],{},"Biogenic carbon."," A negative A1–A3 without the matching end-of-life emission understates the footprint.",[26,285,286,289],{},[29,287,288],{},"Replacements."," How often a product is replaced (module B4) depends on its service life and on the study period of the building, which is 50 years in the EU framework. That is decided at building level and cannot be read off a product table.",[16,291,292],{},"For this reason Quarry returns the GWP of each module exactly as printed in the EPD and does not sum modules or estimate the missing ones. Which modules to combine is the assessor's decision under the method they follow.",[11,294,296],{"id":295},"why-can-you-not-compare-figures-with-different-declared-units","Why can you not compare figures with different declared units?",[16,298,299],{},"A GWP figure always refers to one declared unit, and declared units differ: per kilogram, per tonne, per cubic metre, per square metre at a stated thickness, per piece. Two figures are comparable only after both are converted to the same quantity doing the same job in the building.",[23,301,302,308,314],{},[26,303,304,307],{},[29,305,306],{},"Convert first."," Use the density, thickness or mass per piece stated in the EPD or the technical documentation to bring both figures to one unit.",[26,309,310,313],{},[29,311,312],{},"Compare function, not mass."," A kilogram of one insulation material does not insulate like a kilogram of another. Compare at equal performance, for example equal thermal resistance or equal load-bearing capacity for the same span. A functional unit expresses exactly this: a quantified performance used as the reference.",[26,315,316,319],{},[29,317,318],{},"Check the rules behind the figures."," EPDs are comparable only if they follow the same product category rules and the same edition of EN 15804, cover the same modules and report the same indicator. Conventions differ even within one material: some cement and concrete EPDs report GWP-fossil including the emissions from waste-derived fuels, others report it without them.",[16,321,322,326,327,331],{},[40,323,325],{"href":324},"\u002Fblog\u002Flow-carbon-concrete-steel-epd-gwp","Low-carbon concrete and steel: how to read the GWP in an EPD"," looks at two materials where these checks matter, and ",[40,328,330],{"href":329},"\u002Fblog\u002Fen-15804-en-15978-explained","EN 15804+A2 and EN 15978 explained"," covers the standards behind them.",{"title":333,"searchDepth":334,"depth":334,"links":335},"",2,[336,337,338,339,340,341,342],{"id":13,"depth":334,"text":14},{"id":50,"depth":334,"text":51},{"id":209,"depth":334,"text":210},{"id":222,"depth":334,"text":223},{"id":235,"depth":334,"text":236},{"id":252,"depth":334,"text":253},{"id":295,"depth":334,"text":296},"What GWP means in an EPD, what life-cycle modules A1–A3, C and D cover, why module D is kept apart, and why modules and declared units need care.","md",[346,349,352,354,357,360],{"question":347,"answer":348},"What does GWP A1–A3 mean in an EPD?","GWP A1–A3 is the global warming potential of the product stage: raw material supply (A1), transport to the factory (A2) and manufacturing (A3). It is given in kg CO₂ equivalent per declared unit, for example per tonne or per cubic metre, and corresponds to a cradle-to-gate boundary. It says nothing about transport to site, installation, use or end of life.",{"question":350,"answer":351},"What is the difference between cradle to gate and cradle to grave?","Cradle to gate stops at the factory gate and equals modules A1–A3. Cradle to grave follows the product through construction, use and end of life, which is modules A, B and C, with module D reported alongside. A cradle-to-gate figure depends least on the project. A cradle-to-grave figure rests on scenarios for transport, service life and disposal.",{"question":223,"answer":353},"Module D describes benefits and loads that arise outside the life cycle of the product, when materials or energy leaving the system are reused, recycled or recovered elsewhere. Because these effects depend on a future scenario and belong to another product system, standards and the EU framework for building-level reporting show them apart from modules A to C instead of netting them off.",{"question":355,"answer":356},"Can I add up modules A to C to get a total?","Only within a defined method. The modules of an EPD are designed to be combined at building level under EN 15978 or a national method, but a simple sum can mislead: some modules may not be declared, scenarios may not match the project, and biogenic carbon makes A1–A3 look low for bio-based products unless end of life is included.",{"question":358,"answer":359},"What is biogenic carbon in an EPD?","Biogenic carbon is carbon derived from biomass, such as the carbon stored in timber. An EN 15804+A2 EPD reports its effect in the GWP-biogenic indicator, module by module, and declares the biogenic carbon content of the product and its packaging in kilograms of carbon. One kilogram of carbon corresponds to 44\u002F12, about 3.67, kilograms of CO₂.",{"question":361,"answer":362},"Can I compare the GWP of two products from different EPDs?","Yes, with conditions. Both EPDs should follow the same edition of EN 15804 and the same product category rules, cover the same modules and report the same indicator. Convert both figures to the same quantity and to the same function in the building, for example equal thermal resistance or equal load-bearing capacity, before drawing a conclusion.",[364,365,366,367,368,369,370],"global warming potential","what is gwp","gwp a1-a3","cradle to gate","cradle to grave","biogenic carbon","en 15804 a2",{},true,"\u002Fblog\u002Fgwp-building-materials-a1-a3","2026-11-17","## What is global warming potential (GWP) in an EPD?\n\nGlobal warming potential (GWP) expresses the climate effect of greenhouse gas emissions in kilograms of carbon dioxide equivalent (kg CO₂ eq). In an environmental product declaration (EPD) it is the amount of greenhouse gases emitted in a defined part of the life cycle of a product, per declared unit, for example per tonne of steel or per square metre of insulation.\n\nThe term has two uses, which is why searches for it mix building materials with refrigerants:\n\n- **For a gas, GWP is a factor.** It says how strongly one kilogram of the gas warms the climate compared with one kilogram of CO₂ over a set period. The factors in current use are calculated over 100 years, with CO₂ set at 1.\n- **For a product, GWP is a result.** Each greenhouse gas emitted is multiplied by its factor and the amounts are added. This is the figure printed in an EPD, and it is the basis of [embodied carbon](\u002Fblog\u002Fembodied-carbon-explained).\n\nEPDs that follow EN 15804+A2 report four climate indicators: GWP-fossil, GWP-biogenic, GWP-luluc (land use and land use change) and GWP-total, which is the sum of the other three. Older EPDs that follow EN 15804+A1 report a single GWP.\n\n## What do the life-cycle modules A1–A3, A4–A5, B, C and D mean?\n\nEach module is a defined slice of the life cycle, and an EPD gives a separate GWP for every module it declares. The structure comes from EN 15804 for products and EN 15978 for buildings.\n\n| Module | Stage                      | What it covers                                               |\n| ------ | -------------------------- | ------------------------------------------------------------ |\n| A1     | Product stage              | Raw material supply                                          |\n| A2     | Product stage              | Transport to the factory                                     |\n| A3     | Product stage              | Manufacturing                                                |\n| A4     | Construction process stage | Transport to the site                                        |\n| A5     | Construction process stage | Construction and installation                                |\n| B1–B5  | Use stage, building fabric | Use, maintenance, repair, replacement, refurbishment         |\n| B6–B7  | Use stage, operation       | Operational energy use and operational water use             |\n| C1     | End-of-life stage          | Deconstruction or demolition                                 |\n| C2     | End-of-life stage          | Transport to waste processing or disposal                    |\n| C3     | End-of-life stage          | Waste processing for reuse, recycling or recovery            |\n| C4     | End-of-life stage          | Disposal                                                     |\n| D      | Beyond the system boundary | Benefits and loads from reuse, recycling and energy recovery |\n\nA1, A2 and A3 are commonly reported as one figure, A1–A3.\n\n## What does GWP A1–A3 mean, and how do cradle to gate and cradle to grave differ?\n\nGWP A1–A3 is the greenhouse gas emission from raw material supply, transport and manufacturing, which is everything up to the factory gate. Cradle to gate means exactly this boundary. Cradle to grave covers the whole life cycle: modules A, B and C, with module D reported alongside.\n\nA1–A3 is the figure quoted most often for a product, because it depends least on the project. From A4 onwards the results rest on scenarios: transport distance, installation, service life, the end-of-life route. The scenario in an EPD may not match your building. RICS's whole-life carbon standard therefore tells assessors to adjust scenario-based data to the project, or to replace it with generic data where it cannot be adjusted.\n\nEPDs that follow EN 15804+A2 are, as a rule, required to declare modules C1–C4 and D in addition to A1–A3. A1–A3 alone tells you about production, not about the life of the product.\n\n## Why is module D reported separately?\n\nModule D lies outside the life cycle of the product itself. It quantifies the net benefits or loads that arise when materials or energy leaving the system are reused, recycled or recovered in another product system, for example metal that is recycled or timber burned with energy recovery. A benefit appears as a negative value.\n\nBecause those effects occur beyond the system boundary and depend on a future scenario, they are shown apart from modules A to C. The EU framework for building-level reporting keeps the same separation. Under Delegated Regulation (EU) 2026\u002F52, the energy performance certificate shows results for the product stage (A1–A3), the construction process (A4–A5), use (B1–B4), operational energy (B6) and end of life (C1–C4), and puts module D in columns of its own. RICS likewise requires module D to be reported separately.\n\nIn practice: read D, report D, and do not subtract it from A to C unless the method you work to says so.\n\n## How is biogenic carbon shown?\n\nBiogenic carbon is carbon derived from biomass, such as the carbon stored in timber. An EN 15804+A2 EPD shows it in two places: in the GWP-biogenic indicator for each module, and as a declaration of the biogenic carbon content of the product and its packaging, in kilograms of carbon.\n\nThe CO₂ absorbed by the growing tree is counted as a removal in A1–A3, so the A1–A3 figure of a timber product can be negative. At end of life the same carbon is counted as an emission, or as a transfer to the next product system, so it balances out over the life cycle. One kilogram of biogenic carbon corresponds to 44\u002F12, about 3.67, kilograms of CO₂.\n\nThis is the main reason why an A1–A3 value on its own can mislead for bio-based products. EPDs under EN 15804+A1 were not required to report biogenic carbon separately, and practice differed between programmes. For comparisons across materials, see [Sustainable building materials: how to compare them with EPD data](\u002Fblog\u002Fsustainable-building-materials-epd-data).\n\n## Why should you not add up modules blindly?\n\nModules are designed to be added, but only within a method. EN 15804 expresses results in modules so that they can be aggregated for a building, and it leaves the rules for that aggregation to the building assessment, which means EN 15978 and national methods. A sum taken straight from the page goes wrong in five ways:\n\n1. **Modules that are not declared.** Not every EPD covers every module, and a module that is not declared is not zero.\n2. **Scenarios that do not fit.** Modules A4, A5, B and C describe the manufacturer's scenario, not your site, your service life or your country's waste routes.\n3. **Module D.** It sits beyond the system boundary and is reported next to the total, not inside it.\n4. **Biogenic carbon.** A negative A1–A3 without the matching end-of-life emission understates the footprint.\n5. **Replacements.** How often a product is replaced (module B4) depends on its service life and on the study period of the building, which is 50 years in the EU framework. That is decided at building level and cannot be read off a product table.\n\nFor this reason Quarry returns the GWP of each module exactly as printed in the EPD and does not sum modules or estimate the missing ones. Which modules to combine is the assessor's decision under the method they follow.\n\n## Why can you not compare figures with different declared units?\n\nA GWP figure always refers to one declared unit, and declared units differ: per kilogram, per tonne, per cubic metre, per square metre at a stated thickness, per piece. Two figures are comparable only after both are converted to the same quantity doing the same job in the building.\n\n- **Convert first.** Use the density, thickness or mass per piece stated in the EPD or the technical documentation to bring both figures to one unit.\n- **Compare function, not mass.** A kilogram of one insulation material does not insulate like a kilogram of another. Compare at equal performance, for example equal thermal resistance or equal load-bearing capacity for the same span. A functional unit expresses exactly this: a quantified performance used as the reference.\n- **Check the rules behind the figures.** EPDs are comparable only if they follow the same product category rules and the same edition of EN 15804, cover the same modules and report the same indicator. Conventions differ even within one material: some cement and concrete EPDs report GWP-fossil including the emissions from waste-derived fuels, others report it without them.\n\n[Low-carbon concrete and steel: how to read the GWP in an EPD](\u002Fblog\u002Flow-carbon-concrete-steel-epd-gwp) looks at two materials where these checks matter, and [EN 15804+A2 and EN 15978 explained](\u002Fblog\u002Fen-15804-en-15978-explained) covers the standards behind them.",6,{"title":5,"description":343},{"loc":373,"lastmod":374},[380,384,388,392,396,400,404],{"title":381,"publisher":382,"url":383},"Glossary: Global-warming potential (GWP)","Eurostat","https:\u002F\u002Fec.europa.eu\u002Feurostat\u002Fstatistics-explained\u002Findex.php?title=Glossary:Global-warming_potential_(GWP)",{"title":385,"publisher":386,"url":387},"Level(s) indicator 1.2: Life cycle Global Warming Potential (GWP), user manual, publication version 1.0","European Commission, Joint Research Centre","https:\u002F\u002Fsusproc.jrc.ec.europa.eu\u002Fproduct-bureau\u002Fsites\u002Fdefault\u002Ffiles\u002F2020-10\u002F20201013%20New%20Level(s)%20documentation_Indicator%201.2_Publication%20v1.0.pdf",{"title":389,"publisher":390,"url":391},"Commission Delegated Regulation (EU) 2026\u002F52: Union framework for the national calculation of life-cycle global warming potential","European Commission, BUILD UP","https:\u002F\u002Fbuild-up.ec.europa.eu\u002Fen\u002Fresources-and-tools\u002Fpublications\u002Funion-framework-national-calculation-life-cycle-global-warming",{"title":393,"publisher":394,"url":395},"EN 15804:2012+A2:2019, official preview (contents, foreword, introduction, scope)","Slovak Office of Standards, Metrology and Testing (UNMS SR)","https:\u002F\u002Fnormy.normoff.gov.sk\u002Fnorma\u002F130702\u002Fnahlad",{"title":397,"publisher":398,"url":399},"Whole life carbon assessment for the built environment, 2nd edition","RICS","https:\u002F\u002Fwww.rics.org\u002Fcontent\u002Fdam\u002Fricsglobal\u002Fdocuments\u002Fstandards\u002FWhole_life_carbon_assessment_PS_Sept23.pdf",{"title":401,"publisher":402,"url":403},"Mer om miljövarudeklaration för byggprodukter (EPD)","Boverket","https:\u002F\u002Fwww.boverket.se\u002Fsv\u002Fbyggande\u002Fhallbart-byggande-och-forvaltning\u002Flivscykelanalys\u002Fmiljodata-och-lca-verktyg\u002Fmiljovarudeklaration-for-byggprodukter-epd\u002F",{"title":405,"publisher":406,"url":407},"EPDs and EN 15804","MPA The Concrete Centre","https:\u002F\u002Fconcretecentre.com\u002FCodes\u002FEnvironmental-Assessment\u002FEPD.aspx","blog\u002Fgwp-building-materials-a1-a3","The global warming potential (GWP) of a building material is its greenhouse gas emissions in kg CO₂ equivalent per declared unit, reported separately for each life-cycle module. A1–A3 is the product stage (cradle to gate), C1–C4 is end of life, and D reports benefits and loads beyond the system boundary and is kept apart. Modules should not be added up without a method, and figures with different declared units cannot be compared directly.",[411,412,413,414,415],"In an EPD, GWP is stated in kg CO₂ eq per declared unit, with one figure for each declared life-cycle module.","GWP A1–A3 covers raw material supply, transport and manufacturing. That boundary is called cradle to gate.","Module D lies beyond the system boundary and is reported separately from modules A to C.","EN 15804+A2 splits the climate result into GWP-fossil, GWP-biogenic and GWP-luluc, which add up to GWP-total.","Convert figures to the same quantity and the same function before comparing two products.",1343,"qxvDAsnYczEOCLW5lQrfsskuYVLSQgIGomTk_6qTO40",[419,425,428],{"path":420,"title":421,"description":422,"publishedAt":374,"updatedAt":374,"primaryKeyword":423,"readingMinutes":424},"\u002Fblog\u002Fai-for-architects-material-data","AI for architects: asking about materials and getting a cited source","How AI for architects handles material questions: why a connected assistant can cite the EPD behind a carbon figure, and what you still check yourself.","ai for architects",7,{"path":42,"title":426,"description":427,"publishedAt":374,"updatedAt":374,"primaryKeyword":43,"readingMinutes":376},"Embodied carbon explained: what it is and how it is calculated","Embodied carbon is the greenhouse gas emitted to make, install, maintain and dispose of building materials. How it is defined, calculated and sourced.",{"path":329,"title":429,"description":430,"publishedAt":374,"updatedAt":374,"primaryKeyword":431,"readingMinutes":424},"EN 15804+A2 and EN 15978 explained for people who use EPDs","What EN 15804 requires of an EPD, what changed from +A1 to +A2, why the two are not comparable, and how EN 15978 uses EPD data in a building LCA.","en 15804",1795523510607]